Item List 261510 |
Date:07/31/2026 |
|
|
RTF Report: CATITEM |
KENTUCKY TRANSPORTATION CABINET
| Contract ID | 261510 | Primary Project Number | DE11408842610 |
| Contract Description | THREE SPRINGS RD (KY 884) | ||
| Primary County | WARREN | Fed/St Number | FD06 114 0884 007-009 |
| Vendor ID | 02519 | Vendor Name | SCOTTY'S CONTRACTING & STONE LLC |
| Bid Amount | $ 14,589,688.92 | ||
| SM- Project | DE11408842610 |
| Fed/State Number | FD06 114 0884 007-009 |
| Project Description | THREE SPRINGS RD (KY 884) |
| *********** |
| SM- Project | DE11408842610 | CATEGORY NUMBER | 0001 | CATEGORY Description | PAVING |
| PROJ LN # | Item Description | BID CODE | Bid Qty | Plan Qty | Unit Price | Unit | % of Bid Amt |
| 0005 | CRUSHED STONE BASE | 00003 | 11,715.000 |
11,715.000 |
$36.230 |
TON | 2.9 |
| 0010 | ASPHALT SEAL AGGREGATE | 00100 | 9.000 |
9.000 |
$59.300 |
TON | 0.0 |
| 0015 | ASPHALT SEAL COAT | 00103 | 1.000 |
1.000 |
$842.500 |
TON | 0.0 |
| 0020 | LEVELING & WEDGING PG64-22 | 00190 | 1,341.000 |
1,341.000 |
$112.300 |
TON | 1.0 |
| 0025 | CL3 ASPH BASE 1.00D PG64-22 | 00214 | 17,384.000 |
17,384.000 |
$91.930 |
TON | 11.0 |
| 0030 | CL3 ASPH SURF 0.38B PG64-22 | 00388 | 3,114.000 |
3,114.000 |
$122.010 |
TON | 2.6 |
| 0035 | CEM CONC ENT PAVEMENT-8 IN | 02101 | 1,884.000 |
1,884.000 |
$101.570 |
SQYD | 1.3 |
| 0040 | JOINT ADHESIVE | 20071EC | 28,600.000 |
28,600.000 |
$0.500 |
LF | 0.1 |
| 0045 | ASPHALT MATERIAL FOR TACK NON-TRACKING | 24970EC | 40.170 |
40.170 |
$664.320 |
TON | 0.2 |
| 0840 | CL4 ASPH SURF 0.38A PG76-22 (ADDED 4-20-26) | 00342 | 185.000 |
185.000 |
$208.200 |
TON | 0.3 |
Category Total $2,825,315.82 |
| SM- Project | DE11408842610 | CATEGORY NUMBER | 0002 | CATEGORY Description | ROADWAY |
| PROJ LN # | Item Description | BID CODE | Bid Qty | Plan Qty | Unit Price | Unit | % of Bid Amt |
| 0050 | CRUSHED AGGREGATE SIZE NO 2 | 00078 | 12,292.000 |
12,292.000 |
$33.880 |
TON | 2.9 |
| 0055 | STANDARD CURB AND GUTTER | 01810 | 16,150.000 |
16,150.000 |
$24.580 |
LF | 2.7 |
| 0060 | STANDARD CURB AND GUTTER MOD | 01811 | 446.000 |
446.000 |
$69.570 |
LF | 0.2 |
| 0065 | LIP CURB AND GUTTER | 01820 | 301.000 |
301.000 |
$36.120 |
LF | 0.1 |
| 0070 | STANDARD INTEGRAL CURB | 01830 | 138.000 |
138.000 |
$32.210 |
LF | 0.0 |
| 0075 | STANDARD HEADER CURB | 01875 | 920.000 |
920.000 |
$26.650 |
LF | 0.2 |
| 0080 | ISLAND HEADER CURB TYPE 1 | 01890 | 86.000 |
86.000 |
$44.200 |
LF | 0.0 |
| 0085 | RELOCATE TEMP CONC BARRIER (REVISED 4-20-26) | 02003 | 5,030.000 |
5,030.000 |
$8.430 |
LF | 0.3 |
| 0090 | JPC PAVEMENT-8 IN | 02084 | 359.000 |
359.000 |
$125.450 |
SQYD | 0.3 |
| 0095 | REMOVE PAVEMENT | 02091 | 700.000 |
700.000 |
$18.890 |
SQYD | 0.1 |
| 0100 | PAVED DITCH TYPE 1 | 02157 | 25.000 |
25.000 |
$261.710 |
SQYD | 0.0 |
| 0105 | TEMP DITCH | 02159 | 4,123.000 |
4,123.000 |
$0.010 |
LF | 0.0 |
| 0110 | CLEAN TEMP DITCH | 02160 | 2,062.000 |
2,062.000 |
$0.010 |
LF | 0.0 |
| 0115 | REMOVE PAVED DITCH | 02165 | 22.000 |
22.000 |
$54.280 |
SQYD | 0.0 |
| 0120 | EMBANKMENT IN PLACE | 02230 | 34,092.000 |
34,092.000 |
$22.460 |
CUYD | 5.2 |
| 0125 | WATER | 02242 | 312.000 |
312.000 |
$0.010 |
MGAL | 0.0 |
| 0130 | REMOVE FENCE | 02265 | 1,036.000 |
1,036.000 |
$3.910 |
LF | 0.0 |
| 0135 | FENCE-8 FT CHAIN LINK | 02275 | 924.000 |
924.000 |
$82.170 |
LF | 0.5 |
| 0140 | G/R-W BEAM-S FACE TL-3 (REVISED 4-20-26) | 02351 | 362.500 |
362.500 |
$25.570 |
LF | 0.1 |
| 0145 | G/R END TREATMENT TYPE 1 | 02367 | 2.000 |
2.000 |
$3,014.840 |
EACH | 0.0 |
| 0150 | G/R END TREATMENT TYPE 2M | 02370 | 3.000 |
3.000 |
$1,371.500 |
EACH | 0.0 |
| 0155 | REMOVE G/R (REVISED 4-20-26) | 02381 | 1,555.000 |
1,555.000 |
$1.790 |
LF | 0.0 |
| 0160 | RIGHT-OF-WAY MONUMENT TYPE 1 | 02429 | 65.000 |
65.000 |
$243.700 |
EACH | 0.1 |
| 0165 | WITNESS POST | 02432 | 33.000 |
33.000 |
$145.400 |
EACH | 0.0 |
| 0170 | CHANNEL LINING CLASS II | 02483 | 3,395.000 |
3,395.000 |
$58.960 |
TON | 1.4 |
| 0175 | CHANNEL LINING CLASS III | 02484 | 3,335.000 |
3,335.000 |
$62.840 |
TON | 1.4 |
| 0180 | CLEARING AND GRUBBING APPROX. 17 ACRES | 02545 | 1.000 |
1.000 |
$62,711.240 |
LS | 0.4 |
| 0185 | TEMPORARY SIGNS | 02562 | 354.000 |
354.000 |
$10.250 |
SQFT | 0.0 |
| 0190 | EDGE KEY | 02585 | 20.000 |
20.000 |
$43.870 |
LF | 0.0 |
| 0195 | FABRIC-GEOTEXTILE CLASS 1 | 02602 | 2,320.000 |
2,320.000 |
$4.350 |
SQYD | 0.1 |
| 0200 | FABRIC-GEOTEXTILE CLASS 2 | 02603 | 12,850.000 |
12,850.000 |
$2.150 |
SQYD | 0.2 |
| 0205 | MAINTAIN & CONTROL TRAFFIC (KY 884) | 02650 | 1.000 |
1.000 |
$242,326.790 |
LS | 1.7 |
| 0210 | PORTABLE CHANGEABLE MESSAGE SIGN (REVISED 4-20-26) | 02671 | 6.000 |
6.000 |
$11,403.600 |
EACH | 0.5 |
| 0215 | MOBILIZATION FOR MILL & TEXT | 02676 | 1.000 |
1.000 |
$5,944.470 |
LS | 0.0 |
| 0220 | ASPHALT PAVE MILLING & TEXTURING (REVISED 4-20-26) | 02677 | 280.000 |
280.000 |
$62.410 |
TON | 0.1 |
| 0225 | SAFELOADING | 02690 | 10.000 |
10.000 |
$500.000 |
CUYD | 0.0 |
| 0230 | TEMP SILT FENCE | 02701 | 6,477.000 |
6,477.000 |
$2.160 |
LF | 0.1 |
| 0235 | SILT TRAP TYPE A | 02703 | 15.000 |
15.000 |
$283.340 |
EACH | 0.0 |
| 0240 | SILT TRAP TYPE B | 02704 | 15.000 |
15.000 |
$266.060 |
EACH | 0.0 |
| 0245 | SILT TRAP TYPE C | 02705 | 15.000 |
15.000 |
$228.790 |
EACH | 0.0 |
| 0250 | CLEAN SILT TRAP TYPE A | 02706 | 15.000 |
15.000 |
$70.440 |
EACH | 0.0 |
| 0255 | CLEAN SILT TRAP TYPE B | 02707 | 15.000 |
15.000 |
$70.440 |
EACH | 0.0 |
| 0260 | CLEAN SILT TRAP TYPE C | 02708 | 15.000 |
15.000 |
$72.280 |
EACH | 0.0 |
| 0265 | SIDEWALK-4 IN CONCRETE | 02720 | 7,459.000 |
7,459.000 |
$49.740 |
SQYD | 2.5 |
| 0270 | STAKING | 02726 | 1.000 |
1.000 |
$126,366.250 |
LS | 0.9 |
| 0275 | RELOCATE CRASH CUSHION (REVISED 4-20-26) | 02898 | 6.000 |
6.000 |
$2,300.450 |
EACH | 0.1 |
| 0280 | INSTALL TEMP CRASH CUSHION (REVISED 4-20-26) | 02900 | 8.000 |
8.000 |
$4,324.830 |
EACH | 0.2 |
| 0285 | CONC BARRIER WALL TYPE 9T (REVISED 4-20-26) | 03171 | 2,860.000 |
2,860.000 |
$23.340 |
LF | 0.5 |
| 0290 | EROSION CONTROL BLANKET | 05950 | 6,500.000 |
6,500.000 |
$1.850 |
SQYD | 0.1 |
| 0295 | TEMP MULCH | 05952 | 57,482.000 |
57,482.000 |
$0.200 |
SQYD | 0.1 |
| 0300 | TEMP SEEDING AND PROTECTION | 05953 | 42,897.000 |
42,897.000 |
$0.300 |
SQYD | 0.1 |
| 0305 | INITIAL FERTILIZER | 05963 | 1.300 |
1.300 |
$1,500.000 |
TON | 0.0 |
| 0310 | MAINTENANCE FERTILIZER | 05964 | 2.100 |
2.100 |
$1,500.000 |
TON | 0.0 |
| 0315 | SEEDING AND PROTECTION | 05985 | 6,222.000 |
6,222.000 |
$0.420 |
SQYD | 0.0 |
| 0320 | SODDING | 05990 | 27,619.000 |
27,619.000 |
$8.000 |
SQYD | 1.5 |
| 0325 | AGRICULTURAL LIMESTONE | 05992 | 25.000 |
25.000 |
$75.000 |
TON | 0.0 |
| 0330 | SBM ALUM SHEET SIGNS .080 IN | 06406 | 297.000 |
297.000 |
$33.970 |
SQFT | 0.1 |
| 0335 | STEEL POST TYPE 1 | 06410 | 400.000 |
400.000 |
$17.360 |
LF | 0.0 |
| 0340 | PAVE STRIPING-TEMP PAINT-6 IN (REVISED 4-20-26) | 06511 | 122,860.000 |
122,860.000 |
$0.310 |
LF | 0.3 |
| 0345 | PAVE STRIPING-PERM PAINT-6 IN (REVISED 4-20-26) | 06515 | 39,989.000 |
39,989.000 |
$0.330 |
LF | 0.1 |
| 0350 | PAVE STRIPING-PERM PAINT-12 IN (REVISED 4-20-26) | 06517 | 77.000 |
77.000 |
$5.000 |
LF | 0.0 |
| 0355 | PAVE STRIPING-THERMO-12 IN W | 06546 | 603.000 |
603.000 |
$6.000 |
LF | 0.0 |
| 0360 | PAVE STRIPING-THERMO-12 IN Y | 06547 | 77.000 |
77.000 |
$6.000 |
LF | 0.0 |
| 0365 | PAVE MARKING-THERMO STOP BAR-24IN | 06568 | 62.000 |
62.000 |
$15.000 |
LF | 0.0 |
| 0370 | PAVE MARKING-THERMO CURV ARROW | 06574 | 34.000 |
34.000 |
$150.000 |
EACH | 0.0 |
| 0375 | PAVE MARKING-THERMO COMB ARROW | 06575 | 8.000 |
8.000 |
$300.000 |
EACH | 0.0 |
| 0380 | PAVE MARKING-THERMO MERGE ARROW | 06578 | 1.000 |
1.000 |
$500.000 |
EACH | 0.0 |
| 0385 | INLAID PAVEMENT MARKER-MW | 06610 | 18.000 |
18.000 |
$25.000 |
EACH | 0.0 |
| 0390 | INLAID PAVEMENT MARKER-BY | 06612 | 379.000 |
379.000 |
$25.000 |
EACH | 0.1 |
| 0395 | FUEL ADJUSTMENT | 10020NS | 21,374.000 |
21,374.000 |
$1.000 |
DOLL | 0.1 |
| 0400 | ASPHALT ADJUSTMENT | 10030NS | 83,017.000 |
83,017.000 |
$1.000 |
DOLL | 0.6 |
| 0405 | OBJECT MARKER TY 3 | 20191ED | 2.000 |
2.000 |
$26.180 |
EACH | 0.0 |
| 0410 | THRIE BEAM TO W BEAM CONNECTOR | 20629NS719 | 2.000 |
2.000 |
$319.110 |
EACH | 0.0 |
| 0415 | LONGITUDINAL EDGE KEY | 21289ED | 7,397.000 |
7,397.000 |
$4.310 |
LF | 0.2 |
| 0420 | G/R STEEL W BEAM-S FACE (7 FT POST) | 21802EN | 2,137.500 |
2,137.500 |
$28.850 |
LF | 0.4 |
| 0425 | PAVE MARKING-THERMO YIELD BAR-36 IN | 22520EN | 56.000 |
56.000 |
$40.000 |
LF | 0.0 |
| 0430 | DETECTABLE WARNINGS | 23158ES505 | 428.000 |
428.000 |
$43.940 |
SQFT | 0.1 |
| 0435 | PAVE MARK-THERMO-YIELD | 24114EC | 4.000 |
4.000 |
$400.000 |
EACH | 0.0 |
| 0440 | BARCODE SIGN INVENTORY | 24631EC | 67.000 |
67.000 |
$23.430 |
EACH | 0.0 |
| 0445 | UTILITY COORDINATION | 24845EC | 1.000 |
1.000 |
$32,250.000 |
LS | 0.2 |
| 0450 | THRIE BEAM G/R TRANSITION TL-2 | 25079ED | 4.000 |
4.000 |
$2,190.020 |
EACH | 0.1 |
| 0455 | THRIE BEAM BULLNOSE TERMINAL | 26236EC | 2.000 |
2.000 |
$21,057.570 |
EACH | 0.3 |
| 0460 | ELECTRONIC DELIVERY MGMT SYSTEM - AGG | 26248EC | 1.000 |
1.000 |
$0.010 |
LS | 0.0 |
| 0820 | MAINTAIN & CONTROL TRAFFIC (I-165) (ADDED 4-20-26) | 02650 | 1.000 |
1.000 |
$60,512.980 |
LS | 0.4 |
| 0825 | REMOVE STRUCTURE (ADDED 4-20-26) | 02731 | 1.000 |
1.000 |
$131,390.000 |
LS | 0.9 |
| 0830 | MILLED RUMBLE STRIPS (ADDED 4-20-26) | 20314ED | 1,600.000 |
1,600.000 |
$2.850 |
LF | 0.0 |
| 0835 | LAW ENFORCEMENT OFFICER (ADDED 4-20-26) | 20411ED | 300.000 |
300.000 |
$96.750 |
HOUR | 0.2 |
Category Total $4,270,328.21 |
| SM- Project | DE11408842610 | CATEGORY NUMBER | 0003 | CATEGORY Description | DRAINAGE |
| PROJ LN # | Item Description | BID CODE | Bid Qty | Plan Qty | Unit Price | Unit | % of Bid Amt |
| 0465 | ENTRANCE PIPE-18 IN | 00441 | 60.000 |
60.000 |
$107.270 |
LF | 0.0 |
| 0470 | ENTRANCE PIPE-24 IN | 00443 | 180.000 |
180.000 |
$130.780 |
LF | 0.2 |
| 0475 | CULVERT PIPE-15 IN | 00461 | 48.000 |
48.000 |
$125.580 |
LF | 0.0 |
| 0480 | STORM SEWER PIPE-12 IN | 00520 | 4.000 |
4.000 |
$306.990 |
LF | 0.0 |
| 0485 | STORM SEWER PIPE-15 IN | 00521 | 2,464.000 |
2,464.000 |
$105.720 |
LF | 1.8 |
| 0490 | STORM SEWER PIPE-18 IN | 00522 | 5,706.000 |
5,706.000 |
$110.040 |
LF | 4.3 |
| 0495 | STORM SEWER PIPE-24 IN | 00524 | 1,474.000 |
1,474.000 |
$130.870 |
LF | 1.3 |
| 0500 | PERFORATED PIPE-4 IN | 01000 | 565.000 |
565.000 |
$23.770 |
LF | 0.1 |
| 0505 | NON-PERFORATED PIPE-4 IN | 01010 | 89.000 |
89.000 |
$23.980 |
LF | 0.0 |
| 0510 | PERF PIPE HEADWALL TY 1-4 IN | 01020 | 2.000 |
2.000 |
$788.220 |
EACH | 0.0 |
| 0515 | PIPE CULVERT HEADWALL-15 IN | 01202 | 2.000 |
2.000 |
$1,400.000 |
EACH | 0.0 |
| 0520 | PIPE CULVERT HEADWALL-18 IN | 01204 | 5.000 |
5.000 |
$1,800.000 |
EACH | 0.1 |
| 0525 | PIPE CULVERT HEADWALL-24 IN | 01208 | 1.000 |
1.000 |
$2,000.000 |
EACH | 0.0 |
| 0530 | SLOPED BOX OUTLET TYPE 1-15 IN | 01432 | 1.000 |
1.000 |
$2,500.000 |
EACH | 0.0 |
| 0535 | S & F BOX INLET-OUTLET-24 IN | 01451 | 1.000 |
1.000 |
$3,200.000 |
EACH | 0.0 |
| 0540 | CURB BOX INLET TYPE A | 01456 | 68.000 |
68.000 |
$7,200.000 |
EACH | 3.4 |
| 0545 | DROP BOX INLET TYPE 3 | 01496 | 11.000 |
11.000 |
$5,400.000 |
EACH | 0.4 |
| 0550 | DROP BOX INLET TYPE 11 | 01544 | 1.000 |
1.000 |
$4,800.000 |
EACH | 0.0 |
| 0555 | DROP BOX INLET TYPE 12 | 01547 | 40.000 |
40.000 |
$585.000 |
LF | 0.2 |
| 0560 | DROP BOX INLET TYPE 13G | 01559 | 7.000 |
7.000 |
$4,800.000 |
EACH | 0.2 |
| 0565 | DROP BOX INLET TYPE 13S | 01568 | 1.000 |
1.000 |
$8,500.000 |
EACH | 0.1 |
| 0570 | DROP BOX INLET TYPE 14 | 01577 | 15.000 |
15.000 |
$4,000.000 |
EACH | 0.4 |
| 0575 | CORED HOLE DRAINAGE BOX CON-4 IN | 01740 | 75.000 |
75.000 |
$200.000 |
EACH | 0.1 |
| 0580 | MANHOLE TYPE A | 01756 | 1.000 |
1.000 |
$5,000.000 |
EACH | 0.0 |
| 0585 | FABRIC-GEOTEXTILE CLASS 2 FOR PIPE | 02607 | 15,135.000 |
15,135.000 |
$2.000 |
SQYD | 0.2 |
| 0590 | CONCRETE-CLASS A | 08100 | 1.990 |
1.990 |
$2,000.000 |
CUYD | 0.0 |
| 0595 | BORE AND JACK PIPE-24 IN | 21799EN | 113.000 |
113.000 |
$638.510 |
LF | 0.5 |
| 0600 | PIPELINE INSPECTION | 24814EC | 5,643.000 |
5,643.000 |
$2.350 |
LF | 0.1 |
| 0845 | PRECAST BOX CULVERT 6'X3' (ADDED 4-20-26) | 24496ED | 95.000 |
95.000 |
$1,285.000 |
LF | 0.8 |
| 0850 | BOX CULVERT HEADWALL (ADDED 4-20-26) | 24695ED | 2.000 |
2.000 |
$11,145.000 |
EACH | 0.2 |
Category Total $2,118,485.49 |
| SM- Project | DE11408842610 | CATEGORY NUMBER | 0004 | CATEGORY Description | BOX CULVERT |
| PROJ LN # | Item Description | BID CODE | Bid Qty | Plan Qty | Unit Price | Unit | % of Bid Amt |
| 0605 | REMOVE CONCRETE MASONRY | 02403 | 18.900 |
18.900 |
$285.000 |
CUYD | 0.0 |
| 0610 | FOUNDATION PREPARATION | 08003 | 1.000 |
1.000 |
$49,315.000 |
LS | 0.3 |
| 0615 | CONCRETE-CLASS A | 08100 | 96.900 |
96.900 |
$865.000 |
CUYD | 0.6 |
| 0620 | STEEL REINFORCEMENT | 08150 | 12,928.000 |
12,928.000 |
$2.100 |
LB | 0.2 |
Category Total $165,668.80 |
| SM- Project | DE11408842610 | CATEGORY NUMBER | 0005 | CATEGORY Description | BRIDGE |
| PROJ LN # | Item Description | BID CODE | Bid Qty | Plan Qty | Unit Price | Unit | % of Bid Amt |
| 0625 | STRUCTURE GRANULAR BACKFILL | 02231 | 242.000 |
242.000 |
$97.000 |
CUYD | 0.2 |
| 0630 | ARMORED EDGE FOR CONCRETE | 03299 | 76.200 |
76.200 |
$103.900 |
LF | 0.1 |
| 0635 | FOUNDATION PREPARATION | 08003 | 1.000 |
1.000 |
$425,323.630 |
LS | 2.9 |
| 0640 | CRUSHED AGGREGATE SLOPE PROT | 08020 | 1,217.000 |
1,217.000 |
$37.650 |
TON | 0.3 |
| 0645 | TEST PILES | 08033 | 108.000 |
108.000 |
$100.000 |
LF | 0.1 |
| 0650 | PILES-STEEL HP12X53 | 08046 | 956.000 |
956.000 |
$90.000 |
LF | 0.6 |
| 0655 | PILE POINTS-12 IN | 08094 | 22.000 |
22.000 |
$275.000 |
EACH | 0.0 |
| 0660 | CONCRETE-CLASS A | 08100 | 562.100 |
562.100 |
$856.000 |
CUYD | 3.3 |
| 0665 | CONCRETE-CLASS AA | 08104 | 630.700 |
630.700 |
$1,030.000 |
CUYD | 4.5 |
| 0670 | MECHANICAL REINF COUPLER #11 | 08136 | 36.000 |
36.000 |
$290.000 |
EACH | 0.1 |
| 0675 | STEEL REINFORCEMENT | 08150 | 68,736.000 |
68,736.000 |
$1.950 |
LB | 0.9 |
| 0680 | STEEL REINFORCEMENT-EPOXY COATED | 08151 | 139,496.000 |
139,496.000 |
$2.000 |
LB | 1.9 |
| 0685 | PRECAST PC BOX BEAM SB27 | 08670 | 1,592.500 |
1,592.500 |
$495.000 |
LF | 5.4 |
| 0690 | BRIDGE CHAIN LINK FENCE-7 FT | 08709 | 456.000 |
456.000 |
$178.000 |
LF | 0.6 |
| 0695 | DRILLED SHAFT 54 IN-SOLID ROCK | 20743ED | 135.000 |
135.000 |
$3,359.000 |
LF | 3.1 |
| 0700 | DRILLED SHAFT 60 IN-COMMON | 20744ED | 459.000 |
459.000 |
$1,300.000 |
LF | 4.1 |
| 0705 | ROCK SOUNDINGS | 20745ED | 488.300 |
488.300 |
$58.600 |
LF | 0.2 |
| 0710 | ROCK CORINGS | 20746ED | 354.000 |
354.000 |
$93.750 |
LF | 0.2 |
| 0715 | CONCRETE SEALING | 23378EC | 30,303.000 |
30,303.000 |
$2.210 |
SQFT | 0.5 |
| 0720 | DECK DRAIN | 23813EC | 8.000 |
8.000 |
$935.000 |
EACH | 0.1 |
| 0725 | MOBILIZATION FOR CONCRETE SURF TREATMENT | 26233EC | 1.000 |
1.000 |
$13,070.000 |
LS | 0.1 |
| 0855 | CSL TESTING (4 TUBES) (ADDED 4-21-26) | 21321NC | 15.000 |
15.000 |
$3,090.000 |
EACH | 0.3 |
Category Total $4,274,962.67 |
| SM- Project | DE11408842610 | CATEGORY NUMBER | 0006 | CATEGORY Description | LIGHTING |
| PROJ LN # | Item Description | BID CODE | Bid Qty | Plan Qty | Unit Price | Unit | % of Bid Amt |
| 0730 | POLE 30 FT MTG HT | 04700 | 10.000 |
10.000 |
$2,650.000 |
EACH | 0.2 |
| 0735 | BRACKET 4 FT | 04720 | 2.000 |
2.000 |
$508.000 |
EACH | 0.0 |
| 0740 | BRACKET 10 FT | 04723 | 7.000 |
7.000 |
$975.000 |
EACH | 0.0 |
| 0745 | BRACKET 15 FT | 04725 | 1.000 |
1.000 |
$1,018.000 |
EACH | 0.0 |
| 0750 | POLE BASE | 04740 | 10.000 |
10.000 |
$3,217.000 |
EACH | 0.2 |
| 0755 | TRANSFORMER BASE | 04750 | 10.000 |
10.000 |
$1,717.000 |
EACH | 0.1 |
| 0760 | LIGHTING CONTROL EQUIPMENT | 04761 | 1.000 |
1.000 |
$21,950.000 |
EACH | 0.2 |
| 0765 | FUSED CONNECTOR KIT | 04780 | 20.000 |
20.000 |
$261.000 |
EACH | 0.0 |
| 0770 | CONDUIT-2 IN | 04795 | 250.000 |
250.000 |
$21.910 |
LF | 0.0 |
| 0775 | TRENCHING AND BACKFILLING | 04820 | 1,267.000 |
1,267.000 |
$4.420 |
LF | 0.0 |
| 0780 | WIRE-NO. 12 | 04832 | 1,209.000 |
1,209.000 |
$1.630 |
LF | 0.0 |
| 0785 | ELECTRICAL JUNCTION BOX TYPE A | 20391NS835 | 8.000 |
8.000 |
$1,757.000 |
EACH | 0.1 |
| 0790 | BORE AND JACK CONDUIT | 21543EN | 250.000 |
250.000 |
$62.350 |
LF | 0.1 |
| 0795 | WIRE-NO. 10 | 23778EC | 5,169.000 |
5,169.000 |
$1.630 |
LF | 0.1 |
| 0800 | LED LUMINAIRE | 24589ED | 10.000 |
10.000 |
$703.000 |
EACH | 0.0 |
| 0805 | PVC CONDUIT-1 1/4 IN-SCHEDULE 80 | 24900EC | 1,267.000 |
1,267.000 |
$8.920 |
LF | 0.1 |
Category Total $181,317.92 |
| SM- Project | DE11408842610 | CATEGORY NUMBER | 0007 | CATEGORY Description | DEMOBILIZATION AND/OR MOBILIZATION |
| PROJ LN # | Item Description | BID CODE | Bid Qty | Plan Qty | Unit Price | Unit | % of Bid Amt |
| 0810 | MOBILIZATION | 02568 | 1.000 |
1.000 |
$543,985.000 |
LS | 3.7 |
| 0815 | DEMOBILIZATION | 02569 | 1.000 |
1.000 |
$209,625.000 |
LS | 1.4 |
Category Total $753,610.00 |